Ascendant Studios

Video game development company in downtown San Rafael.

  • Complete tenant improvement build out (11,000 sq. ft.)
  • Installation of high-end LED lighting
  • Design and installation of custom lighting controls to meet Title 24 requirements
  • Installation of all power and network cabling
  • theHelixSchool building logo

The Helix School

Complete tenant improvement build out (15,000 sq. ft.).

  • All new power and LED lighting throughout
  • Design and installation of lighting controls to meet Title 24 requirements

Mezzetta

Build out of a new olive stuffing room and walk-in cooler.

  • New switchgear addition
  • New equipment power, LED lighting and lighting controls
  • New panels and transformer

Tolay Regional Park Shop

The previous shop was lost in a fire in may 2012.

  • New 3,750 sq. ft. shop
  • Complete Title 24 compliant lighting control system
  • New 200A main panel to support, office, wood shop and open shop areas

Have an upcoming project? Let’s discuss it.

© Copyright 2023 Tri County Electric, Inc. License #987606