100KVA Ground Mount Transformer

Installation of a new 100 KVA transformer to support a new 400A main service with two 200A meter mains.

Emergency Power & Communication Services

This project supported emergency operation centers in Sonoma County.

  • Installation of temporary fiber communication and temporary power
  • Emergency operations supported 2017 Firestorm, 2018 Kincade Fire, COVID 2019

Load Study

A load study is an important aspect to determine generator sizing for an existing building and/or if an existing electrical system can handle additional load. A typical load study is performed for a 30-day period and then downloaded and sent to an electrical engineering firm for analysis.

Sonoma Memorial Veterans Building Generator

  • Installation of a new 80KW diesel Kohler standby generator
  • Installation of a 400A automatic transfer switch

Spud Point Marina Transformer Replacement

Dock A, B, D – Replacement of three existing transformers with three new 112.5 KVA 480V transformers.

Have an upcoming project? Let’s discuss it.