100KVA Ground Mount Transformer
Installation of a new 100 KVA transformer to support a new 400A main service with two 200A meter mains.
This project supported emergency operation centers in Sonoma County.
A load study is an important aspect to determine generator sizing for an existing building and/or if an existing electrical system can handle additional load. A typical load study is performed for a 30-day period and then downloaded and sent to an electrical engineering firm for analysis.
Dock A, B, D – Replacement of three existing transformers with three new 112.5 KVA 480V transformers.